Projects 42 Birch Lane (Main House)
Complete
JS

Client Details

Client Name
Michael & Laura Thompson
Property Address
42 Birch Lane, Richmond
Phone
07841 329 574
Email
michael@example.com

Project Details

Reference
ESL-2023-001
Type
House Refurbishment
Duration
Circa 8-10 months
Project Manager
John Smith
Start Date
9th January 2023
End Date
31st October 2023
Project Budget
£212,180
Budget (inc VAT)
£254,616

Schedule of Works

Each phase acts as an epic that groups related project tasks. Click a task to edit it, or use the check to mark it complete.

Task Trade Status Est Cost
Site Labour
General day to day site labour, waste management, meeting deliveries and tidying
Labour Complete - -
Strip Wallpaper
Strip wallpaper from any rooms where needed
Labour Complete - -
Remove Electrical Fixtures
Remove and dispose of all electrical fixtures, fittings and wall lighting
Labour Complete - -
Remove Kitchen & Utility
Remove and dispose of existing kitchen and utility including units, worktop and appliances
Labour Complete - -
Remove Sanitaryware
Remove and dispose of WC, bathroom and ensuite sanitaryware
Labour Complete - -
Remove Ceilings
Remove and dispose of plasterboard (artex) ceilings to ground floor
Labour Complete - -
Task Trade Status Est Cost
Temp Site Power
Make safe electrics and connect temporary site power for project duration
Electrics Complete - -
New Cable Runs
Run all new electric cables from fuseboard in garage to sockets and switches
Electrics Complete - -
New Studwork & Boxings
Fabricate and install new studwork partitions and boxings throughout
Carpentry Complete - -
Plumbing 1st Fix
Run new hot, cold and waste pipework to kitchen, bathrooms and utility
Plumbing & Heating Complete - -
Install Windows
Remove existing windows and install new double-glazed units throughout
Carpentry Complete - -
Install Front Door
Fit new front door and sidelights
Carpentry Complete - -
Fit New Staircase
Remove existing staircase and fit new oak staircase
Carpentry Complete - -
Task Trade Status Est Cost
Insulate Ceilings
Insulate all ceilings before plaster is applied
Plastering Complete - -
Insulate New Studwork
Insulate all new studwork partitions
Plastering Complete - -
Plaster Walls & Ceilings
Complete plastering of walls and ceilings throughout
Plastering Complete - -
Task Trade Status Est Cost
UFH System Install
Install underfloor heating manifolds, pipework and controls
Plumbing & Heating Complete - -
Screed Ground Floor
Apply renovation screed to ground floor
Plastering Complete - -
Screed Top Floor
Apply renovation screed to top floor
Plastering Complete - -
Task Trade Status Est Cost
LVT Flooring Install
Install LVT flooring throughout
Flooring Complete - -
Task Trade Status Est Cost
Kitchen Install
Install kitchen units, worktops and appliances
Carpentry Complete - -
Bathroom Install
Fit bathroom sanitaryware, shower enclosures and tiling
Plumbing & Heating Complete - -
Hang Internal Doors
Hang all internal doors with new furniture
Carpentry Complete - -
Fix Skirts & Archs
Install new MDF skirting and architrave throughout
Carpentry Complete - -
LED Downlights
Install LED downlights throughout
Electrics Complete - -
Pendant Lighting
Install pendant lighting in kitchen, games room, dining and landing
Electrics Complete - -
Heating Test
Commission and test full heating system
Plumbing & Heating Complete - -
Decorating
Full mist coat, undercoat and topcoat to all rooms
Decorating Complete - -
Task Trade Status Est Cost
Builders Clean
Full builders clean throughout
Labour Complete - -
Mastic Seal Kitchen
Apply mastic seal around kitchen units and worktops
Labour Complete - -
Mastic Seal Bathrooms
Apply mastic seal around bathroom sanitaryware
Labour Complete - -

Client Brief - Scope of Works

This specification sheet is based on an initial meeting with Robert Thompson on Tuesday 11th Oct 2022, and a subsequent meeting with Rob & Nicole on Monday 31st October 2022, and on Wed 16th Nov 2022. This spec is based on the original plan although the client has provided a new upstairs layout which he is aware will impact on certain prices.

Should the client wish to make any amendments post project commencement, these will be detailed in an additional services sheet with the relevant additions/subtractions to the price.

Tender Process
Title Description Est Cost
Estimate Stage Based on 1 site visit and brief discussions with client £212,180 -
Specification Stage Following a further site visit and detailed discussion with client, including visits to preferred suppliers - -
Final Spec & Contract Once client is completely satisfied with full spec for the project - -
Estimate Stage
Based on 1 site visit and brief discussions with client
Est£212,180
Cost-
Specification Stage
Following a further site visit and detailed discussion with client, including visits to preferred suppliers
Est-
Cost-
Final Spec & Contract
Once client is completely satisfied with full spec for the project
Est-
Cost-

Services Specification

Contingency

Rate from estimate: 10% - Amount: £17,682
£124,850
Quoted Total
£106,123
Net Total

Labour Cost Breakdown

£81,939
Quoted Total
£70,467
Net Total

Materials Cost Breakdown

Title Description Est Net
50x50 Timber For boxings and noggins £350 £298
50x100 CLS Stud Prepared 4x2 timber for studwork £480 £408
Aqua Panel Aqua panel for loo frame in WC £220 £187
Skirting Pre-primed 6" Pencil edge MDF Skirting £2,800 £2,382
Architrave Pre-primed 69mm Pencil edge MDF Architrave £1,966 £1,675
Title Description Est Net
Kitchen / Diner Steel Steels for kitchen / diner opening £1,175 £1,000
Front Door Steel Steels for front door opening £1,175 £1,000
Hallway / Dining Steel Steels for hallway / dining room opening £1,175 £1,000
Title Description Est Net
Internal Doors (Downstairs) 8no. Internal doors @£225 per door £2,115 £1,800
Internal Doors (Upstairs) 10no. Internal doors @£225 per door £2,644 £2,250
Cupboard Doors 2no. Coat cupboard doors £529 £450
Pocket Door Systems 1no. single & 1no. double pocket door systems £588 £500
Door Furniture 15no. Pairs of Handles, 3 Hinges per door, latches £705 £600
Door Furniture 3no. Flush handles & 2no. pair parliament hinges £88 £75
Locks & Turns 4no. Internal bath lock and bath turn £188 £160
Door Stops Door stops with rose £59 £50
Front Door + Sidelights Front door set and 2no. Sidelights £4,114 £3,500
Title Description Est Net
Underfloor Heating Minitec overlay UFH system, multi zone control £13,326 £11,337
System Boiler & Flue New Vaillant system boiler, horizontal flue £1,586 £1,350
Hot Water Cylinder Unvented indirect 300L £1,058 £900
MLCP / Copper & Waste Pipework Maincore pipework, connectors etc £5,875 £5,000
Ventilation 5no. Silent 100 Extractor fan £470 £400
Title Description Est Net
Self Levelling [Supply & Fit] Mapei self-levelling compound over UFH £5,916 £5,035
Title Description Est Net
Staircase Single flight staircase with glass balustrade £5,483 £4,666
Title Description Est Net
Windows Adam Windows £4,606 £3,920
Title Description Est Net
Included in labour costs - -
Title Description Est Net
Included in labour costs - -
Title Description Est Net
Front Wall StoneCraft / BuildPro blockwork and capping £7,243 £6,164
£31,757
Additional Services (1st batch)
£17,903
Extra Additional (2nd batch)
£49,660
Total Extras (Net)

Additional Services / Extras

Description Added Amended Client Approved Net Price Cost
Asbestos Testing - 6no. areas on 24hr turnaround 12/01/2023 -
Yes
£329 £280
Flue Liner - Removal of existing system, install cowl 18/01/2023 -
Yes
£394 £335
Design Bureau - SE Specification 22/01/2023 -
Yes
£405 £345
Building Control Sign-Off - Structural changes 25/01/2023 -
Yes
£288 £245
Floor removal - glued down oak in dining & bedrooms 02/02/2023 -
Yes
£235 £200
Carpentry extras - Caberdek, door linings, acoustic insulation, loft ladder 08/02/2023 15/03/2023
Yes
£7,155 £6,090
Electrical extras - WC mirror, sensor lights, stair lighting, additional wiring 14/02/2023 20/04/2023
Yes
£3,300 £2,808
Staircase - Change supplier + stringer LEDs + protection 05/03/2023 -
Yes
£1,599 £1,361
Windows - Replacement sealed units & servicing 18/03/2023 10/04/2023
Yes
£3,765 £3,204
Garage Door - Lathams Security Steel Door 25/04/2023 -
Yes
£549 £467
Structural Work - Big breaker hire, windows, blocking, lintels, screeding 02/05/2023 -
Yes
£3,885 £3,307
Plastering extras - Dot & dab, make good, encasement 15/05/2023 -
Yes
£6,620 £6,620
Rendering - External finish, reveals, removed SVPs 10/07/2023 -
Yes
£1,200 £1,200
Exterior Decoration - Re-paint entire property inc annexeNew 20/08/2023 -
Yes
£6,463 -
Technology - 3no. Ubiquiti WiFi 6 Pro access points & PoE switchNew 28/08/2023 15/09/2023
Yes
£555 £473
Front Wall - StoneCraft stone, pier caps, materials, lightingNew 12/10/2023 -
Pending
£4,469 -

Images & Reference

Items & Costs

ItemSupplierSpecificationCostNotes
LVT FlooringFloorify Toffee4.5mm, 2000x240mm£54.95/m²110m² total area
ProScreed LtdMike4.5mm over 110m²£1,800ESL cost
FittingAlanFitted inc underlay£57.50/m²
Threshold BarsAntique Brass Gripper£1453 x bars from carpet/lvt

Notes

Images & Reference

Items & Costs

RoomSupplierSpecificationNet PriceDeposit (inc VAT)
Master EnsuiteBathroom Elegance / RipplesFull sanitary ware package£7,018£4,211
Ensuite 2Bathroom Elegance / RipplesFull sanitary ware package£4,838£2,903
Ensuite 3Bathroom Elegance / RipplesFull sanitary ware package£4,995£2,997
WCBathroom Elegance / RipplesWC suite£1,393£836

Notes

Images & Reference

Items & Costs

RoomProductSupplierQtyCost
Primary BathroomBottega Caliza 45x120Porcelanosa28 tiles£2,010
Primary BathroomSpiga Bottega Caliza 45x120Porcelanosa4 tiles£319
Ensuite 2Bottega Caliza 45x120Porcelanosa14 tiles£1,005
Ensuite 3Bottega Caliza 45x120Porcelanosa12 tiles£862
WCWelsh Porcelain Slate Cardiff WhitePorcelanosaFloor only£162

Notes

Images & Reference

Notes

Images & Reference

Notes

Images & Reference

Items & Costs

OptionRoomSpecificationSupplierGross CostNet Cost
Option 1Dining Room2-part sliding, Rosewood on White PVCuAdam Windows£5,995£4,996
Option 2Lounge / Study / KitchenSliding + flat windows, Rosewood on White PVCuAdam Windows£12,315£10,263
Option 3BedroomsFlat windows, Rosewood on White PVCuAdam Windows£11,220£9,350
RooflightHallwayFlat glass rooflight 060060Velux£2,017£2,017

Notes

Images & Reference

Items & Costs

RoomSizeTypeSupplierCost
Living Room (Glazed)1981 x 762 x 35mmBolection Iris Oak, GlazedTodd Doors£261
Living Room (Nr Kitchen)1981 x 838 x 35mmBolection Iris Oak, GlazedTodd Doors£261
Kitchen (FD30)1981 x 838 x 44mmBolection Iris Oak, Fire DoorTodd Doors£179
Study / WC / Bedrooms (x6)VariousBolection Iris OakTodd Doors£179 each
Hallway Cupboards (x6)VariousConcealed Flush PrimedDirect Doors / Rocket£399

Notes

Images & Reference

Notes

Payment Schedule

Stage 1
Deposit 60%
Paid
£127,308
+ £21,218 VAT = £148,526 total
Paid 2nd January 2023
Stage 2
1st Fix Complete 20%
Paid
£42,436
+ £7,073 VAT = £49,509 total
Paid 15th May 2023
Stage 3
Project Completion 20%
Paid
£42,436
+ £7,073 VAT = £49,509 total
Paid 10th November 2023

Financial Summary

Labour Total (Net) £92,409
Materials Total (Net) £70,467
General Items Total (Net) £6,267
Total Job Spend £169,143
Total Client Spend (inc Additional Services) £213,737
Actual Profit (inc fees on direct client payments) £61,854 (28.94%)
Client Direct Payments

Items removed from original estimate - client paid suppliers directly. 17.5% ESL management fee applied.

Sanitaryware£17,500
Kitchen£17,000
Utility£7,800
Flooring (LVT & Carpet)£13,300
Fenestration (French Doors / Sliders)£16,675